FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide
Figure 8-25 Installing a TFM
4.
5.
Step 9 Connect the cable between the supercapacitor and the screw-in RAID controller
card.
Step 10 Install the supercapacitor holder.
1.
2.
3.
Issue 07 (2019-12-20)
Install the screw-in RAID controller card.
For details, see
8.4.4 Installing the Screw-in RAID Controller
Go to
Step
10.
Install the supercapacitor holder into the node panel and tighten the screws
to secure the supercapacitor holder. See (1) in
Install the node panel. See (2) in
Tighten the screws to secure the panel. See (3) in
Copyright © Huawei Technologies Co., Ltd.
Figure
Figure
8-26.
Figure
8 Parts Replacement
Card.
8-26.
8-26.
62