Installing The Tpm - Huawei FusionServer Pro XH321 V5 V100R005 Maintenance And Service Manual

Server node
Hide thumbs Also See for FusionServer Pro XH321 V5 V100R005:
Table of Contents

Advertisement

FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide
Figure 8-50 Removing a TPM
Step 8 Remove the M.2 SSD.
For details, see
Step 9 Place the removed component in an ESD bag.
----End

8.4.16 Installing the TPM

Procedure
Step 1 Power off the server node.
For details, see
Step 2 Remove the server node.
For details, see
Step 3 Place the server node on the ESD workstation.
Step 4 Remove the air duct.
For details, see
Step 5 Determine the position of the TPM.
Issue 07 (2019-12-20)
8.4.1 Removing an M.2
8.3.2 Power-Off
8.3.3 Removing an XH321
8.4.23 Removing the Air
Copyright © Huawei Technologies Co., Ltd.
SSD.
Procedure.
V5.
Duct.
8 Parts Replacement
83

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fusionserver pro xh321 v5V100r005

Table of Contents