Screw-In Raid Controller Card - Huawei TaiShan 200 2280 Maintenance And Service Manual

Hide thumbs Also See for TaiShan 200 2280:
Table of Contents

Advertisement

TaiShan 200 Server
Maintenance and Service Guide (Model 2280)

5.14 Screw-in RAID Controller Card

● This section uses the server with Kunpeng 920 7260, 5250, or 5230 processors
● Before removing a RAID controller card, you can use Smart Provisioning to
Removing the Screw-in RAID Controller Card
Step 1 Wear an ESD wrist strap. For details, see
Step 2 Power off the server. For details, see
Step 3 Remove the power cables. For details, see
Step 4 Remove the server. For details, see
Step 5 Remove the chassis cover. For details, see
Step 6 Remove the supercapacitor if the server is configured with one. For details, see
5.15
Step 7 If I/O module 2 is configured with a full-height full-length riser module, remove
the riser module. For details, see
Step 8 Determine the position of the screw-in RAID controller card on the mainboard. See
Figure
Issue 04 (2020-01-16)
NO TICE
as an example to describe the internal structure of a server. The procedures for
removing and installing the screw-in RAID controller card are the same for the
server configured with Kunpeng 920 5220 or 3210 processors.
delete data stored on the RAID controller card. For details, see "Erasing Hard
Smart Provisioning User Guide 02 (aarch64)
Disks" in the
Supercapacitor.
5-61.
Copyright © Huawei Technologies Co., Ltd.
5.2 ESD
Protection.
5.4.2 Powering Off the
5.7
PSU.
5.4.4 Removing the Server and Guide
5.8 Chassis
5.11 Riser
Module.
5 Removal and Installation
.
Server.
Cover.
Rails.
124

Advertisement

Table of Contents
loading

Table of Contents