Requirements For Performing The Test - Siemens SINUMERIK Series Function Manual

Eps network services
Hide thumbs Also See for SINUMERIK Series:
Table of Contents

Advertisement

2 Machine Information
2.3 Test series on the machine

2.3.2 Requirements for performing the test

Requirements on the control
When making measurements, the machine axes must be moved with precisely the
motion profile that is defined in the NC program. In addition, it must also be guaran-
teed that the motion is also executed in the machine coordinates.
The following functions in the NCK could be problematical when carrying out mea-
surements (sample selection):
Asynchronous subprograms
Static synchronized actions
Axis couplings
Kinematic transformations
Superimposed (overlaid) motion, such as DRF, external work offset
Tool length compensation
Functions that influence the velocity, such as G95
Functions that change the position, such as DIAMON
Axis replacement / geometry axis replacement
Axis is passed over to the PLC (PLC axis)
The NC program for performing the measurement does not affect the functions li-
sted above. Only the zero offsets are disabled and the offset produced by DRF and
external zero offset is compensated statically, i.e. the value is corrected by the va-
lue that applies at the beginning of the measurement.
Orientation transformations are a special case. It is possible to execute measure-
ments with the geometry axes when transformation is active. However, the offset of
the geometry axis coordinates produced by the orientation axes is not compen-
sated for. It is therefore advisable to deactivate transformation.
Couplings between axes should be separated before the measurement movement
(e.g. in the prolog program). The NC program of the ePS system does not separate
couplings. The ePS system assumes that it is possible to load, select, and start an
NC program (with subprograms) downloaded from the ePS system on the machine
in a particular channel. For machines where the PLC prevents the operator from
selecting or starting any NC program, the PLC can communicate with the ePS sys-
tem via DB10.DBB90 or DBB91.
Machine data must be set in the control to acquire data for the condition monitoring
measurements. Not only Trace Server machine data but also MD 36730:
DRIVE_SIGNAL_TRACKING must be set.
Drives that are linked via PROFIBUS must be handled differently. Here the
PROFIBUS configuration must be changed so that the torque values can be
transmitted to the control cyclically.
2-58
© Siemens AG 2012 All Rights Reserved
ePS Network Services, Function Manual (FH) - 03/2012
03/2012