Loading The Project To The Target Device - Siemens SINAMICS S120 Getting Started

Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Loading the project to the target device

In order to set up your project, you need to load the project data you generated offline on the
connected drive units. Project data are generated, for example:
● When configuring the hardware
● When configuring networks and connections
Preconditions
● The project data is consistent.
● Each drive unit to be loaded can be accessed online.
Procedure
When in the online mode, proceed as follows to download project data to the drive device:
1. Select one or more drive units in the project tree.
2. Open the shortcut menu "Load to device" or click on the icon
toolbar.
– If you have already established an online connection, the "Load preview" dialog
– If you have not yet established any online connection, the "Extended loading" dialog
Getting Started, 12/2018, 6SL3097-5AG30-0BP0
opens. This dialog displays alarms and proposes actions necessary for loading.
opens and you must first select the interfaces with which the online connection to the
device should be established. You have the option of showing all compatible devices
by selecting the corresponding option and clicking the "Start search" command.
See also Section "Establishing an online connection to the drive unit (Page 101) "
7
(Load to device) in the
163

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents