B.3

Commissioning and validation checklist

B.3
Commissioning and validation checklist
Serial
Requirement
no.
3
Commissioning
3.1
Has a complete function test been
conducted and documented?
3.2
Has the operating personnel been
instructed in the handling of the module?
Date
Name
B.4

Modification and retrofitting checklist

Serial
Requirement
no.
4
Modification and retrofitting
4.1
Is the modification/retrofitting of the system
compatible? Do all of the checklist's
requirements on the planning, installation
and commissioning/validating continue to
be fulfilled?
4.2
Are the calculated reaction times still
complied with after the modification/
retrofitting? Proof is required!
4.3
Has a complete function test been
conducted and documented?
Date
Name
102
Operation Manual Safety Module for b maXX 5000 BM5-O-SAF-000/-001
Document no.: 5.09013.07
of 114
Fulfilled
Remarks
Yes No
Signature
Fulfilled
Remarks
Yes No
Signature
Baumüller Nürnberg GmbH