11.1
Risk assessment
The risk assessment should be conducted according to the procedure described in the
following.
Figure 24:
Delineation of the system:
Hazard analysis:
Risk estimation:
Risk assessment:
68
Operation Manual Safety Module for b maXX 5000 BM5-O-SAF-000/-001
Document no.: 5.09013.07
of 114
CAUTION!
It is absolutely necessary to conduct the risk assessment during the planning phase
and before conducting retrofitting work.
Risk assessment procedure in accordance with DIN EN ISO 12100-1 and EN ISO 14121
Determination of the limits of the system's boundaries
and the intended use
Identification of hazards and the related hazardous
situations
Estimation of the risks for each hazard identified
Assessment of the risks and establishment of risk
reduction measures
Baumüller Nürnberg GmbH