Mitsubishi Electric C80 Series Connection And Set Up Manual page 175

Hide thumbs Also See for C80 Series:
Table of Contents

Advertisement

C80 Series Connection and Setup Manual
10 PLC CPU Initial Setup
(12) Click [+] in front of the "No. 2 (Receive)" to set the refresh for No.2.
When connecting two units of CNC CPU, set the refresh for CPU No. 3, and when connecting three units of CNC
CPU, set the refresh for CPU No. 4.
[When connecting one unit of CNC CPU]
(Note) The setting for CPU No. 2 above is an example of when the system has one CNC CPU, two part systems and eight control
axes.
[When connecting two units of CNC CPU]
- Refresh setting for CPU No. 2
(Note) The setting value for CPU No. 2 is the setting example for two units of CNC CPU, 2-part system and eight
control axes.
IB-1501452-C
Detail Settings
Points
Start
400
X700
626
D1024
64
W80
1184
R4500
64
R6372
50
R8000
400
R11800
200
R0
200
R20000
400
R500
400
R20500
350
R6500
10
R8290
450
R7500
1500
R8300
Detail Settings
Points
Start
400
X700
626
D1024
64
W80
1184
ZR4500
64
ZR6372
50
ZR8000
400
ZR11800
200
ZR0
200
ZR20000
400
ZR500
400
ZR20500
350
ZR6500
10
ZR8290
450
ZR7500
1500
ZR8300
144

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents