Mitsubishi Electric C80 Series Connection And Set Up Manual page 147

Hide thumbs Also See for C80 Series:
Table of Contents

Advertisement

C80 Series Connection and Setup Manual
9 GOT Initial Setup
(1) When starting GT Designer3, the "New Project Wizard" dialog box will appear.
When clicking [Next], "GOT System Setting" dialog box of the "New Project Wizard" will appear.
When checking the box of "Use easily-distinguishable font for 0 (zero) and I", the distinction of the letter will be
easier.
(2) After selecting the item for the GOT Type from the pull-down menu, click [Next].
GOT Type: Select a GOT model to be used. (The below drawing shows the screen when selecting "GT27**-S...".)
When "Confirmation of GOT System Setting" is displayed in the "New Project Wizard", confirm the content and then
click [Next].
When "Setting of Controller (1st)" of "Communication" dialog is displayed, select the items according to the
followings in the pull-down menu.
Manufacturer: MITSUBISHI ELECTRIC
Controller Type: MELSEC iQ-R, RnMT/NC
IB-1501452-C
116

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents