DISASSEMBLY & ASSEMBLY
SUPER TURBINE " 4 0 0 '
Figure 5-517
4. Disconnect solenoid lead from
connector terminal. See Figure
5-519.
5. Check band apply Pin.
a. Attach the band apply pin se-
lection Gauge J-21370, to the
transmission case with attaching
screws.
b. Apply 25 ft. lb. torque and
select proper pin to be used dur-
ing assembly of transmission.
See Figure 5-520.
There are three selective pins
identified as follows:
Pin Identification
Pin Size
3 Rings
2 Rings
1 Ring
Long
Medium
Short
Figure 5-519
Figure 5-522
The identification ring is located
Figure 5-520
on the band lug end of the pin.
Selecting the proper pin is the
equivalent of adjusting the band.
6. Compress fingers on connector
and withdraw connector and "O"
ring seal. See Figure 5-521.
Figure 5-523
7. Remove the solenoid attaching
screws, solenoid assembly and
gasket. See Figure 5-222.
8. Remove the control valve as-
sembly spacer plate and gasket.
See Figure 5-523.
ACCUMUUT^SpRIN
m
•&•".;":...;J
Figure 5-518
Figure 5-521
Figure 5-524

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wildcat 1965Electra 225 1965Rivera 1965

Table of Contents