Buick LeSabre 1965 Service Manual page 267

Chassis 45000, 46000, 48000, 49000
Table of Contents

Advertisement

SUPER TURBINE "300*
SERVICE PROCEDURES
5 - 5 3
4. Remove pinion shaft and pinion
gear from planet carrier. See
Figure 5-247.
NOTE: Remove the other two (2)
short planet pinion gears in same
manner as described in Steps 4
and 5.
THRUST
WASHERS
PINION
SHAFT
NEEDLE
BEARINGS
Figure 5-248
5. Remove needle bearings, and
thrust washers (2) from the short
planet pinion gear. See Figure
5-248.
Figure 5-254
Figure 5-251
10. Remove front planet pinion
7. Remove input sun gear. See
thrust washer and long planet
Figure 5-251.
pinion gear. See Figure 5-254.
THRUST WASHERS
P I N I O N
SHAFT
SPACER
NEEDLE BEARINGS
Figure 5-252
8. Remove input sun gear thrust
washer. See Figure 5-252.
Figure 5-255
11. Remove needle b e a r i n g s ,
spacer and two (2) thrust washers
from the long planet pinion gear.
See Figure 5-255.
Figure 5-250
6. Remove low sun gear needle
thrust bearing. See Figure 5-250.
Figure 5-253
9. Insert Brass Drift through long
planet pinion. Remove the long
planet pinion shaft. See Figure
5-253.
Figure 5-256
12. Remove rear planet pinion
thrust washer. See Figure 5-256.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wildcat 1965Electra 225 1965Rivera 1965

Table of Contents