Buick LeSabre 1965 Service Manual page 275

Chassis 45000, 46000, 48000, 49000
Table of Contents

Advertisement

SUPER TURBINE " 3 0 0 '
SERVICE PROCEDURES
5 - 6 1
3. Install two (2) pump cover to
clutch drum oil sealing rings.
See Figure 5-315.
5 - 2 5 INSTALLATION OF
OIL PUMP GUIDE
PIN, GASKET AND
OIL PUMP
ASSEMBLY
Figure 5-316
1. Install oil pump to case seal.
See Figure 5-316.
Figure 5-317
2. Install new pump gasket and
guide pins. See Figure 5-317.
3. Install input shaft oil rings.
See Figure 5-318.
" O " rings under head). See Fig-
ure 5-321.
6. Torque the eight (8) pump re-
taining bolts to 16-24 ft. lbs. See
Figure 5-322.
5 - 2 6 LOW BAND
ADJUSTMENT
I N C H LBS.
TORQUE WRENCH
4. Coat input shaft oil rings with
oil and install into oil pump. Then
install pump into case. Apply a
thin coat of oil around edge of
pump. See Figure 5-320.
Figure 5-323
1. Adjust low band by first tight-
ening adjusting screw to 40 in.
lbs. torque. See Figure 5-323.
Figure 5-321
5. Remove guide pins and install
eight (8) retaining bolts (with new
Figure 5-324
Figure 5-318
Figure 5-322
Figure 5-325

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wildcat 1965Electra 225 1965Rivera 1965

Table of Contents