Installing The Server On Holding Rails - Huawei RH2288 V3 User Manual

Table of Contents

Advertisement

RH2288 V3 Server
User Guide
3.
Step 3 After the installation is complete, connect a network cable, a VGA cable, or USB devices as
required. Connect the power cables and power on the RH2288 V3.
----End

3.4.3 Installing the Server on Holding Rails

Holding rails apply to a cabinet with a distance of 610 mm to 914 mm (24.02 in. to 35.98 in.)
between the front and rear mounting bars.
When installing the RH2288 V3 on the holding rails, you can configure a cable management
arm (CMA) to arrange the external cables connected to the server.
Procedure
Step 1 Install the holding rails.
1.
Issue 32 (2019-03-28)
Figure 3-8 Installing the RH2288 V3
When the two mounting ears of the RH2288 V3 come into contact with the mounting
bars on the cabinet, tighten the captive screws on the mounting ears to secure the
RH2288 V3. See step (2) in
Holding down the release latch at the front end of the holding rail, pull out the locking
plate by its hook. See steps (1) and (2) in
Copyright © Huawei Technologies Co., Ltd.
Figure
3-8.
Figure
3-9.
3 Installing and Removing the Server
71