Installing A 2288X V5; Installing The Server On L-Shaped Guide Rails Or Static Rail Kit - Huawei FusionServer Pro 2288X V5 User Manual

Hide thumbs Also See for FusionServer Pro 2288X V5:
Table of Contents

Advertisement

FusionServer Pro 2288X V5 Server
User Guide
Figure 7-7 Installing the ball bearing rail kit
Step 5 Install the other rail in the same way.
----End

7.2.5 Installing a 2288X V5

7.2.5.1 Installing the Server on L-Shaped Guide Rails or Static Rail Kit

Before installing the server, properly install the L-shaped guide rails or static rail
kit. For details, see
the Static Rail
Issue 04 (2020-06-05)
7.2.4.1 Installing L-Shaped Guide Rails
Kit.
Copyright © Huawei Technologies Co., Ltd.
7 Installation and Configuration
or
7.2.4.2 Installing
77

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r005

Table of Contents