Installing A 1288H V5; Installing The Server On L-Shaped Guide Rails Or Static Rail Kit - Huawei FusionServer Pro 1288H V5 User Manual

Hide thumbs Also See for FusionServer Pro 1288H V5:
Table of Contents

Advertisement

FusionServer Pro 1288H V5 Server
User Guide
Step 3 Align the front end of the rail with the hole on the front column of the cabinet,
push the rail horizontally, and insert the rail into the hole on the column from the
side. See (4) in
Step 4 Push the hook horizontally until the release latch clicks into place. See (5) in
Figure
Figure 7-7 Installing the ball bearing rail kit
Step 5 Install the other rail in the same way.
----End

7.2.5 Installing a 1288H V5

7.2.5.1 Installing the Server on L-Shaped Guide Rails or Static Rail Kit

Before installing the server, properly install the L-shaped guide rails or static rail
kit. For details, see
the Static Rail
Issue 13 (2020-06-05)
Figure
7-7.
7-7.
7.2.4.1 Installing L-Shaped Guide Rails
Kit.
Copyright © Huawei Technologies Co., Ltd.
7 Installation and Configuration
or
7.2.4.2 Installing
63

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r005

Table of Contents