Installing The Server On Holding Rails - Huawei RH2288H V3 User Manual

Hide thumbs Also See for RH2288H V3:
Table of Contents

Advertisement

RH2288H V3 Server
User Guide
4.
Step 2 Install the RH2288H V3.
1.
2.
3.
Step 3 After the installation is complete, connect a network cable, a VGA cable, or USB
devices as required. Connect the power cables and power on the RH2288H V3.
----End

3.4.3 Installing the Server on Holding Rails

Holding rails are designed for cabinets with a distance of 610 mm to 914 mm
(24.02 in. to 35.98 in.) between the front and rear mounting bars.
When installing the RH2288H V3 on the holding rails, you can configure a CMA to
arrange the external cables connected to the server.
Issue 46 (2022-12-28)
NO TE
While screws are not necessary for the installation of adjustable guide rails, M6 screws
at the rear end of the server will make it more shockproof and secure.
Install the other guide rail using the same method.
Lift the RH2288H V3 and move it to the cabinet. This task requires at least
two people.
Place the RH2288H V3 onto the guide rails and slide it into the cabinet. See
step (1) in
Figure
3-8.
Figure 3-8 Installing the RH2288H V3
When the two mounting ears of the RH2288H V3 come into contact with the
mounting bars on the cabinet, tighten the captive screws on the mounting
ears to secure the RH2288H V3. See step (2) in
Copyright © Huawei Technologies Co., Ltd.
3 Installing and Removing the RH2288H V3
Figure
3-8.
88

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r003

Table of Contents