FusionServer Pro 2288H V5 Server
User Guide
Step 5 Check indicator status.
For details, see
----End
7.2.5.2 Installing a Server on Holding Rails
For details, see
Procedure
Step 1 Install the server.
At least two people are required to move the device. Otherwise, personal injury or device
damage may occur.
1.
2.
Issue 08 (2019-10-30)
2.1.2 Indicators and
7.2.4.3 Installing Holding
NO TICE
Pull out the inner rails as far as they will go.
Figure 7-9 Pulling out an inner rail
Lift the server (at least two people are required), align the nail heads on the server with
the L-shaped cutouts on the inner rails, and push the server until it clicks into position.
See (1) and (2) in
Figure
Copyright © Huawei Technologies Co., Ltd.
Buttons.
Rails.
7-10.
7 Installation and Configuration
82