Commissioning SINAMICS drives
8.3 Quick Commissioning NX (topology takeover)
Figure 8-9
4. Close the information with "OK".
Operating sequence via the "Drive units" menu
1. You are in the "Drive units" menu (see last figure "Drive units menu" after topology
2. Select the next drive module, the NX (e.g. " CU_CX32_126") with the vertical softkey
3. The HMI recognizes, that topology takeover has not yet taken place.
Figure 8-10
4. Close the information with "OK".
Topology matching completed
Topology matching for drive units with the associated drive components has been
completed.
As the next step you can perform the factory settings.
Factory settings are preset when the software is supplied on the CompactFlash card.
For first commissioning you can use the operating steps for performing the update of
component frimware (Page 70) to continue.
If you have already performed a commissioning, then proceed with the operating steps for
establishing factory settings.
See also
Commissioning NX <-> Drive (Page 208)
68
Topology matching completed
matching).
"Drive unit+/Drive unit-".
Quick Commissioning starts.
Start the topology takeover queries by clicking on "OK" twice.
Topology matching completed
CNC Part 1 (NCK, PLC, drive)
Commissioning Manual, 11/2006, 6FC5397-2AP10-2BA0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics s120Sinumerik 840de sl

Table of Contents