Siemens SINUMERIK 804D sl Commissioning Manual page 200

Cnc part 1 nck, plc, drive
Table of Contents

Advertisement

Tips
13.4 Integrating PG/PC into the network (NetPro)
Figure 13-15 Configured PG/PC in the network configuration
8. Select "Save and compile > Save and check all" and confirm the process with "OK".
200
The subsequent operator input sequence steps describe loading this hardware
configuration to NCU.
CNC Part 1 (NCK, PLC, drive)
Commissioning Manual, 11/2006, 6FC5397-2AP10-2BA0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics s120Sinumerik 840de sl

Table of Contents