Figure 57: Connecting The Ac Power Cord To The Switch; Figure 58: Plugging In The Ac Power Cord To The Switch - Allied Telesis x530 Series Installation Manual

Stackable gigabit layer 3 ethernet switches
Hide thumbs Also See for x530 Series:
Table of Contents

Advertisement

Figure 57. Connecting the AC Power Cord to the Switch
3. Lower the power cord retaining clips to secure the cord to the switch.
Refer to Figure 58.
Figure 58. Plugging in the AC Power Cord to the Switch
4. Repeat steps 1 to 3 to connect a power cord to the second power
supply.
x530 Series Installation Guide for Virtual Chassis Stacking
P S U 2
1 0 0 -
2 4 0
V A C
~
P S U 2
1 0 0
- 2 4 0
V A C
~
4589
4590
147

Advertisement

Table of Contents
loading

Table of Contents