Installing A Gs970M/10 Switch On A Wall; Figure 38: Ridges On The At-Brkt-J23 That The Switch Rests On When Installed With The Front Panel Facing Up - Allied Telesis CentreCOM GS970M Series Installation Manual

Managed gigabit ethernet switch
Hide thumbs Also See for CentreCOM GS970M Series:
Table of Contents

Advertisement

Installing a GS970M/10 switch on a wall

These instructions show you how to install a GS970M/10 switch on a wall.
The wall mount kit is AT-BRKT-J23 and can be purchased separately from
your Allied Telesis dealer.
Before you start, ensure that the wall is sturdy enough to hold the switch's
weight. You may need to position the switch so that the brackets can be
screwed into the wall's framing timber or an equivalent structural element.
To install the switch on a wall, perform the following procedure:
1. If the rubber feet are attached to the bottom of the switch, remove
them with a screwdriver (Figure 25 on page 55), then turn the switch
back over.
2. Determine the desired bracket position on the wall and screw the
brackets to the wall with the screws included in the wall mount kit.
You can install the switch with the front panel facing up (as shown in
Figure 39 on the next page), left, or right (as shown in Figure 40 on the
next page). Do not install the switch with the front panel facing down.
Note that the brackets are not attached to the switch, but only to the
wall.
If you install the switch with the front panel facing up, the switch will
rest on the edges of the bracket, as shown in Figure 38.
F
38. R
IGURE
IDGES ON THE
WHEN INSTALLED WITH THE FRONT PANEL FACING UP
Attached to wall
GS9790M Series Switch Installation Guide
AT-BRKT-J23
THAT THE SWITCH RESTS ON
Ridges
65

Advertisement

Table of Contents
loading

Table of Contents