Procedure
28 March 2018
Installation and Initial Operation
Connect them as follows:
1.
Insert the push-in hose nozzles into the bulkhead connectors
on the plate attached to the master unit.
2.
Connect the pressure hoses together using the push-in T-con-
nectors .
3.
Connect the pressure hoses via the push-in T-connectors to
the water feed and return of the satellite unit(s).
The illustration below shows a master unit (far right) and two
satellite units with the installed water connection set.
Multifors 2 - Parallel Bench-top Bioreactor