Interval
Maintenance work
Before every op-
Check supply lines and connection hoses for leaks and replace as
eration
necessary
Check all O-rings and rubber seals and replace if necessary
Check the vessels integrity and replace if necessary
Check all filters, replace exit gas filter
After every fer-
Sterilise and clean the vessel, the vessel top plate, built in parts of the
mentation / culti-
vessel top plate, corrective reagent hoses and bottles and pump
vation
heads.
After max. 4000
Stirrer shaft cell cultures:
operating hours
Exchange the ball bearings
(approx. 6
months)
Every 6 months
Check and calibrate the measurement chains (Pt-100, O2, pH etc.)
with a simulator.
If required
Clean the basic unit and the operating panel with a damp cloth or dis-
infect with an appropriate disinfectant (depending on what substances
may accidentally come into contact with the basic unit and/or operat-
ing panel)
Wipe the screen of the operating panel with a cloth used for computer
screens, laptops etc.
28 March 2018
Multifors 2 - Parallel Bench-top Bioreactor
Maintenance
To carry out by
User
User
User
User
User
User
Qualified per-
sonnel
User
User
Page 177 of 211
Need help?
Do you have a question about the Multifors 2 and is the answer not in the manual?