Powering On The Switch - Allied Telesis AT-GS920/16 Installation And User Manual

Gigabit ethernet unmanaged switches
Table of Contents

Advertisement

GS920 Series Gigabit Ehternet Switch Installation and User's Guide

Powering On the Switch

To power on the switch, perform the following procedure:
1. Plug the power cord into the power connector on the back of the
switch.
2. Plug the other end of the power cord into a wall outlet.
Warning
Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord.
Advertissement
Le cordon d'alimentation est utilisé en tant que mécanisme de
déconnexion. Pour mettre l'équipement hors tension, débrancher le
cordon d'alimentation.
Note
Pluggable Equipment. The socket outlet shall be installed near the
equipment and shall be easily accessible.
E3
E3
E5
58

Advertisement

Table of Contents
loading

Table of Contents