Powering On The Switch; Figure 34: Installing The Retaining Clip - Allied Telesis AT-GS950/28PS Installation Manual

Gigabit ethernet poe+ switches
Hide thumbs Also See for AT-GS950/28PS:
Table of Contents

Advertisement

Chapter 2: Installation

Powering On the Switch

Powering on the
AT-GS950/10PS,
AT-GS950/16PS,
and AT-GS950/
28PS Switches
60
To power on the switch, perform one of the following procedures,
depending on your model:
For AT-GS950/10PS, AT-GS950/16PS, and AT-GS950/28PS
switches, refer to "Powering on the AT-GS950/10PS, AT-GS950/
16PS, and AT-GS950/28PS Switches".
For the AT-GS950/48PS switch, refer to "Powering on the AT-GS950/
48PS Switch" on page 63.
To install the power cord retaining clip and power on the switch, perform
the following procedure:
1. To install the power cord retaining clip, position it with the "u" part
facing down, press in the sides, and insert the ends of the clip into the
holes in the retaining bracket on the AC connector. See Figure 34.
Figure 34. Installing the Retaining Clip

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-gs950/48psAt-gs950/16psAt-gs950/10ps

Table of Contents