Allied Telesis AT-GS920/16 Installation And User Manual page 48

Gigabit ethernet unmanaged switches
Table of Contents

Advertisement

GS920 Series Gigabit Ehternet Switch Installation and User's Guide
Installing a Switch Using the AT-BRKT-J23 Wall Mount Kit
This section shows you steps to install a switch on a wall using the
AT-BRKT-J23 kit. To install the switch on a wall, perform the following
procedure:
1. If the rubber feet were previously installed, turn the switch upside
down and remove them as shown in Figure 16.
Figure 16. Removing the Rubber Feet
2. Orient the brackets against the sides of the switch.
3. Have another person hold the switch with the brackets at the wall
location where the switch is to be installed, while you use a pencil to
mark the wall with the locations of the four holes in the brackets. See
Figure 17 as an example.
AT-BRKT-J23
Figure 17. Marking the Screw Hole Locations
Note
Figure 17 shows the front panel oriented toward the left side.
However, the switch can be mounted on the wall with the front panel
facing left, right, up or down.
48

Advertisement

Table of Contents
loading

Table of Contents