Allied Telesis AT-GS920/16 Installation And User Manual page 104

Gigabit ethernet unmanaged switches
Table of Contents

Advertisement

GS920 Series Gigabit Ehternet Switch Installation and User's Guide
3. Have another person hold the switch with the brackets at the wall
location where the switch is to be installed. Use a pencil to mark the
wall with the locations of the four holes in the brackets. See Figure 58
as an example.
x
Figure 58. Marking the Screw Hole Locations
4. Pre-drill the marked locations on the wall at the locations marked in
Step 3.
5. Install the four plastic anchors into the wall in the holes drilled in
Step 4.
104

Advertisement

Table of Contents
loading

Table of Contents