Download Print this page

Powering On The Switch - Allied Telesis CentreCOM GS980M Series Quick Installation Manual

Gigabit ethernet switches

Advertisement

2. Slide the transceiver into the port until it clicks into place.
To attach the fiber optic cable to the transceiver, continue with
the next step. Otherwise, repeat steps 1 ans 2 to install the
remaining transceivers in the switch.
3. Remove the dust cover from the transceiver.
4. Connect the fiber optic cable to the transceiver. The connector
should fit snugly into the port, and the tab should lock the
connector into place.
5. Repeat this procedure to install additional transceivers.
6. Go to "Powering On the Switch" on page 13.

Powering On the Switch

Warning: Power cord is used as a disconnection device.
To de-energize equipment, disconnect the power cord.
1. Install the power cord retaining clip on the AC power connector
on the rear panel of the switch, and raise the clip.
2. Connect the power cord to the connector and lower the retaining
clip to secure the power cord.
CentreCOM GS980M Series Quick Installation Guide
E3
13

Advertisement

loading

This manual is also suitable for:

Centrecom gs980m/52Centrecom gs980m/52ps