9. Place the other two brackets on the top of the switch and mark the
screw hole locations with a pencil as shown in Figure 61.
x
Figure 61. Marking the Screw Hole Locations
10. Remove the two brackets and switch and set aside.
11. Pre-drill the marked locations on the wall at the locations marked in
Step 9.
12. Install the four plastic anchors into the wall in the holes drilled in Step
11.
13. Slide the switch into the bottom brackets and place the other two
brackets on the top of the switch
14. Install the screws through the bracket holes to attach them to the wall.
See Figure 62 on page 107.