Allied Telesis AT-GS920/16 Installation And User Manual page 49

Gigabit ethernet unmanaged switches
Table of Contents

Advertisement

4. Pre-drill the marked locations on the wall at the locations marked in
Step 3.
5. Install four plastic anchors into the wall in the holes drilled in Step 4.
6. Position brackets on the wall and drive screws through the holes to
attach the brackets on the wall. See Figure 18.
Figure 18. Driving the Screws through the Holes
7. Make sure that the two brackets are installed securely.
8. Slide the switch into the brackets on the wall as shown in Figure 19.
Figure 19. Placing the Switch into the Brackets
9. Proceed to "Cabling the Switch" on page 57.
Chapter 2: Hardware Installation
49

Advertisement

Table of Contents
loading

Table of Contents