Installing At-Qsfpsr4 Or At-Qsfplr4 Transceivers In Qsfp+ Slots - Allied Telesis x550 Series Installation Manual

Stackable 10gigabit intelligent access ethernet switches, alliedware plus v5.4.8-0.2
Hide thumbs Also See for x550 Series:
Table of Contents

Advertisement

Chapter 7: Cabling the Networking Ports

Installing AT-QSFPSR4 or AT-QSFPLR4 Transceivers in QSFP+ Slots

118
This section contains the procedure for installing AT-QSFPSR4 or AT-
QSFPLR4 transceivers in the QSFP+ slots 17 and 21.
Please review "Guidelines to Handling SFP, SFP+, and QSFP+
Transceivers" on page 111 before performing this procedure.
To install AT-QSFPSR4 or AT-QSFPLR4 transceivers, perform the
following procedure:
1. Remove the dust cover from QSFP+ slot 17 or 21. Refer to Figure 70
on page 119.
2. Slide a QSFP+ transceiver into the slot until it clicks into place.
3. Attach fiber optic cable to the transceiver.
4. Connect the other end of the cable to a compatible QSFP+ port in
another network device.
5. Repeat this procedure to install a second QSFP+ transceiver.
Note
To remove the connector and cable from the slot, gently push on the
connector, pull on the release tab, and slide the connector from the
slot.

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-x550-18xtqAt-x550-18xsqAt-x550-18xspqm

Table of Contents