Installing Sfp Or Sfp+ Transceivers; Figure 91: Installing An Sfp Transceiver - Allied Telesis AlliedWare Plus GS980MX Series Installation Manual

Stackable gigabit layer 3+ ethernet switches
Table of Contents

Advertisement

Chapter 10: Cabling the Networking Ports

Installing SFP or SFP+ Transceivers

234
This section contains installation instructions for SFP or SFP+
transceivers on the following ports:
Ports 9 and 10 on the GS980MX/10HSm switch
Ports 17 and 18 on the GS980MX/18HSm switch
Ports 25 and 28 on the GS980MX/28 or GS980MX/28PSm switch
Ports 49 and 52 on the GS980MX/52 or GS980MX/52PSm switch
The following illustrations show a transceiver with a duplex LC connector.
The connectors on your transceivers may be different.
To install transceivers, perform the following procedure:
1. Select a port for the transceiver.
2. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
3. If you are installing the transceiver in a top port, position the
transceiver with the Allied Telesis label facing up. If you are installing
the transceiver in a bottom port, position the transceiver with the label
facing down. Refer to Figure 91.
Figure 91. Installing an SFP Transceiver
4. Slide the transceiver into the port until it clicks into place.
2 5
2
5 G /
2 . 5 G
/ 1 G
/ 1 0 0
2 6
S F
P +
2 7 /
S 1
1 0 G
/
1 G
4574