(4) Tighten the screws in the wall securely.
Note:
1. The flange installation bracket is needed in the flange installation of 1.5~30kW inverters, while the flange
installation of 37~200kW inverters does not need the installation bracket.
2. 220~315kW inverters need optional base in the floor installation.
4.2.4 Multiple installations
Parallel installation
Note:
Before installing the different sizes inverters, please align their top position for the convenience of later
maintenance.
The minimum space of B, D and C is 100mm.
4.2.5 Vertical installation
18 - 144
Fig 4-3 Parallel installation
Fig 4-4 Vertical installation
Installation Guidelines