Hitachi CB 520H A1 User Manual page 394

Logical partitioning manager, compute blade 500 series
Hide thumbs Also See for CB 520H A1:
Table of Contents

Advertisement

Message Content
What to do
Message Content
Explanation
LPAR manager
operation
What to do
Message Content
Explanation
LPAR manager
operation
What to do
Message Content
Explanation
LPAR manager
operation
What to do
Message Content
Explanation
LPAR manager
operation
What to do
Message Content
Explanation
LPAR manager
operation
9-18
Hitachi Compute Blade 500 Series Logical partitioning manager User's Guide
LPAR activation failed(Insufficient LPAR memory(System
Increase the allocated memory size for LPAR and then activate
the LPAR increase memory size.
LPAR corrupted in a LPAR Migration exist,
Please try again after recovering the LPAR.
Since there is a LPAR which has failed due to LPAR migration, it
cannot be operated.
Aborts the specified process.
Retry the specified operation to the LPAR after recovering the
LPAR Migration.
LPAR deactivation failed.
The LPAR cannot be deactivated.
Aborts LPAR deactivation.
Check that LP system logs showing failure are collected or not. If
this action takes no effect, contact the reseller from which you
purchased this equipment or consult maintenance personnel.
The target LPAR failed to restart.
Aborts the specified process.
Retry the process.
Maximum number of users exceeded.
The maximum number of users has already been registered.
Aborts the specified process.
Delete unnecessary users, and then try adding a user again.
Memory allocation failed (Fragmentation).
When you activated an LPAR, the memory capacity you specified
could not be secured.
Aborts LPAR activation.
Messages
Used:xxMB))
LPAR start failed.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents