Hitachi CB 520H A1 User Manual page 373

Logical partitioning manager, compute blade 500 series
Hide thumbs Also See for CB 520H A1:
Table of Contents

Advertisement

Figure 8-2 Collecting LPAR manager Dump Confirmation Screen
3
Confirm a sub-screen displays below.
.
Figure 8-3 Collection of the LPAR manager Dump Completion
The sub-screen above indicates completion of LPAR manager Dump
collection.
Follow the steps below to check that the LPAR manager dump has been
correctly generated and written to the non-volatile storage of the
Management Module.
4
Display the LP system logs screen.
.
5
Set the level selection to All level.
.
6
Confirm two LP system logs of "LPAR manager dump transfer succeeded"
.
exist on the screen, and their recorded times are around the time of
operation for collecting LPAR manager Dump.
LPAR manager Dump Collection
Hitachi Compute Blade 500 Series Logical partitioning manager User's Guide