Moving Circuits - Lucent Technologies CBX 3500 Configuration Manual

Hide thumbs Also See for CBX 3500:
Table of Contents

Advertisement

Beta Draft Confidential

Moving Circuits

The Move Circuit function enables you to move a circuit endpoint defined for one
logical port (the source) to another logical port (the destination). If you are upgrading
a switch or replacing an IOM and do not want to lose PVC connections, you can use
this function to move circuits to another switch or IOM.
This function has the following restrictions:
The following steps describe the process for moving a circuit endpoint:
1. In the Switch tab, expand the Circuits node.
2. Select the PVCs node.
3. Right-click on the PVCs node and select Move Circuit Endpoint from the pop-up
ATM Services Configuration Guide for CBX 3500, CBX 500, GX 550, and B-STDX 9000
You should not move a circuit that is currently in use; traffic may be lost.
You cannot move a circuit for which you have manually defined a circuit path.
The VPI/VCI must be unique to the destination logical port.
The Move Circuit function fails if the number of circuits moved exceeds the
maximum allowed for the IOM.
You can not move a circuit with one endpoint defined with SNB. Navis
EMS-CBGX will display the error message "Cannot move circuit with one
endpoint defined on service name."
menu, as shown in
Figure
Figure 10-29. Moving a Circuit Endpoint
10-29.
Configuring ATM PVCs
Moving Circuits
1/19/0510-89

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cbx 500Gx 550B-stdx 9000

Table of Contents