Moving The Gx 550 Es To The Installation Site; Unpacking The Gx 550 Es Extender - Lucent Technologies GX 550 ES Hardware Installation Manual

Table of Contents

Advertisement

Beta Draft Confidential

Moving the GX 550 ES to the Installation Site

Due to the large size and weight of a fully configured GX 550 ES extender, Lucent
recommends moving the extender to the installation site before unpacking it from the
shipping carton.
Caution – A fully configured GX 550 ES extender weighs up to 85 pounds. To
!
avoid potential injury, use a hand lift for moving or rack-mounting the extender.

Unpacking the GX 550 ES Extender

To unpack the GX 550 ES:
1. Open the carton and remove all enclosed packing materials from the shipping
carton. Save the packing materials in case you need to repack the GX 550 ES later.
2. Using a #2 Phillips-head screwdriver, remove the screws from the L-brackets on
the delivery pallet (see
3. Carefully remove the GX 550 ES from the pallet.
GX 550 ES Hardware Installation Guide
Ex. 2006
Moving the GX 550 ES to the Installation Site
Figure 3-1 on page
3-2).
Preparing for the Installation
000055
4/5/033-3

Advertisement

Table of Contents
loading

Table of Contents