IBM R30 Operator's Manual page 230

Table of Contents

Advertisement

Main Memory Sharing Test
This test is launched by the BUMP and performed by all configured processors. It has a
sub-test to check the capability of all the processors to access the main memory. The
following h/w parts are checked during the process:
1. DCB ASICs
2. IONIAN ASICs
3. SSGA ASIC
4. SMC ASIC
BUMP displays the overall test results.
Multi Resource Sharing Test
BUMP launches and manages the test results. All configured processors perform this test. It
has one sub-test, which checks the capability of all the processors to access the following
I/O resources simultaneously:
1. Main Memory
2. NVRAM
3. Async Lines
The following h/w parts are checked during the process.
1. DCB ASICs
2. IONIAN ASICs
3. SSGA ASIC
4. SMC ASIC
Multi Resources Full Test
This test is the hardest test performed by the machine. To be fully efficient, it must be:
launched on three processors at least (one of them is used as a de-synchronize
processor).
performed during thirty seconds at least. Its main characteristic is to perform random
accesses into main memory, with a very high implication of L1 and L2 caches.
A-22
Operator Guide

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

R40R50

Table of Contents