As you push the server into the rack, verify that the cable management arm (CMA) retracts
without binding.
Note -
To pull a green release tab, place your finger in the center of the tab, not on the end, and
apply pressure as you pull the tab toward the front of the server.
Continue pushing the server into the rack until the slide-rail locks (on the
b.
front of the server) engage the slide-rail assemblies.
You will hear an audible click when the server is in the normal rack position.
If the CMA is not installed, that is, you removed it because you removed the
2.
server completely out of the rack, install the CMA.
For installation instructions for the CMA, refer to
(Optional)" in Oracle Servers X7-2 and X7-2L Installation
If the cables are disconnected from the back of the server, that is, you
3.
disconnected the cables because you removed the server completely out of the
rack, reconnect the cables.
For instructions to reconnect cables to the back of the server, see
and Power Cords" on page
Return the Server to the Normal Rack Position
"Install the Cable Management Arm
214.
Guide.
"Reconnect Data Cables
Returning the Server to Operation