Remove The Server From The Rack; Take Antistatic Measures - Oracle X7-2 Service Manual

Hide thumbs Also See for X7-2:
Table of Contents

Advertisement

"Remove the Server From the Rack" on page 61
"Reinstall the Server Into the Rack" on page 211

Remove the Server From the Rack

The server weighs approximately 35.0 lbs (15.88 kg). Two people are required to
Caution -
dismount and carry the chassis.
1.
Disconnect all the cables and power cords from the server.
Remove the cable management arm (CMA).
2.
Refer to
"Remove the Cable Management Arm" in Oracle Servers X7-2 and X7-2L Installation
Guide.
3.
Extend the server to the maintenance position.
See
"Extend the Server to the Maintenance Position" on page
4.
From the front of the server, pull the green slide-rail release tabs toward the front
of the server, and pull the server out of the rack until it is free of the rack rails.
A slide-rail release tab is located on each slide-rail.
To pull the green slide-rail release tab, place your finger in the center of the tab, not on
Note -
the end, and apply pressure as you pull the tab toward the front of the server.
5.
Set the server on a sturdy work surface.
Related Information
"Disconnect Cables From the Server" on page 58
"Take Antistatic Measures" on page 61
"Extend the Server to the Maintenance Position" on page 59
"Reinstall the Server Into the Rack" on page 211

Take Antistatic Measures

1.
Prepare an antistatic surface on which to set parts during removal and
installation.