YASKAWA MP2200 User Manual page 367

Machine controller
Hide thumbs Also See for MP2200:
Table of Contents

Advertisement

Appendix C Simple Connection Function of the Engineering Tool (Supported by the CPU-03 and CPU-04)
4.
Turn ON the 100-VAC power supply to the MP2200, and confirm that the RDY and RUN are lit on the
CPU-03/CPU-04 Module.
Note: For the CPU-04, the TRX indicator functions as a CARD indicator.
5.
Double-click the icon on the personal computer desktop to start up MPE720 Ver6.
6.
Create a new PLC folder.
7.
Click Communications Setting.
:Lit
:Unlit
C.2 Procedure
A
A-17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents