Multiple Chs2U Chassis Installation - NEC Univerge SV8100 System Hardware Manual

Full-featured ip based communications system
Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

Issue 1.0
3 - 12
7.
Connect the ground wire to all chassis. Refer to
19" Chassis Grounding on page 3-34
grounding the system.
8.
Refer to
installation of the chassis or, Chapter 5 paragraph
Installing an Extension or Trunk Blade on page 4-4
installation of blades.
2.2.2

Multiple CHS2U Chassis Installation

Expansion chassis can be secured to the CHS BASE UNIT and will
require an additional CHS2U JOINT BRACKET KIT per chassis.
Figure 3-13 Install CHS2U JOINT BRACKET KIT
2.5 Installing the 19" Chassis on page 3-22
UNIVERGE SV8100
2.5.5 Install
for complete details on
to continue
2.2
for
Installing the SV8100 Chassis

Advertisement

Table of Contents
loading

Table of Contents