Figure 3-57 Floor Mount Spacing Guide
2.
Mark and drill the four holes required for installing the CHS
BASE UNIT.
3.
Align bolt holes in CHS BASE UNIT (see
Mount Spacing Guide on page
and secure using four anchor bolts.
4.
Align and install the CHS LARGE BATT BOX on top of the CHS
BASE UNIT. Refer to
BATT BOX using the CHS2U JOINT BRACKET KIT on page
3-45.
UNIVERGE SV8100
Figure 3-57 Floor
3-44) with holes drilled in floor
Figure 3-58 Installing the CHS LARGE
Installing the SV8100 Chassis