NEC Univerge SV8100 System Hardware Manual page 275

Full-featured ip based communications system
Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

UNIVERGE SV8100
System Hardware Manual
Figure 5-64 Ribbon Cable Installed
9.
Align the projections on the bottom of the 8LKI
(LD)-L UNIT into the guide holes on top of the
multiline terminal (refer to
Installed).
10.
Slide the 8LKI (LD)-L UNIT toward the keypad
buttons until snug (refer to
UNIT
Installed).
Figure 5-65 8LKI (LD)-L UNIT Installed
Guide
Projection
Guide
(One Each Side)
Figure 5-64 Ribbon Cable
Figure 5-65 8LKI (LD)-L
Issue 1.0
5 - 57

Advertisement

Table of Contents
loading

Table of Contents