GE MiCOM P40 Agile Technical Manual page 21

Single breaker current differential (with distance)
Hide thumbs Also See for MiCOM P40 Agile:
Table of Contents

Advertisement

P543i/P545i
12.2.4
12.2.5
Zone 4 Reach Check
12.2.6
Zone P Reach Check
12.2.7
Zone Q Reach Check
12.2.8
Resistive Reach
12.2.9
12.3
12.3.1
Phase A
12.3.2
Phase B
12.3.3
Phase C
12.3.4
12.4
12.4.1
12.4.2
Scheme Trip Tests for Permissive Schemes
12.4.3
Scheme Trip Tests for Blocking Scheme
12.4.4
12.4.5
Signal Send Test for Blocking Scheme
12.4.6
Scheme Timer Settings
13
13.1
Single-ended Testing
13.1.1
13.1.2
Single-ended Injection Test
13.1.3
Forward Fault Preparation
13.2
Operation and Contact Assignment
13.2.1
Phase A
13.2.2
Phase B
13.2.3
Phase C
13.3
13.3.1
Signal Send Test for Permissive Schemes
13.3.2
Signal Send Test for Blocking Schemes
14
14.1
Dependency Conditions
14.2
Earth Current Pilot Scheme
14.2.1
Preliminaries
14.2.2
Perform the Test
14.2.3
Forward Fault Trip Test
14.3
Scheme Testing
14.3.1
Signal Send Test for Permissive Schemes
14.3.2
Signal Send Test for Blocking Schemes
15
Out of Step Protection
15.1
OST Setting
15.2
15.3
Predictive and OST Setting
15.4
OST Timer Test
16
16.1
Dependency Conditions
16.2
Overcurrent Check
16.3
Connecting the Test Circuit
16.4
Performing the Test
16.5
Check the Operating Time
17
17.1
Check Synchronism Pass
17.2
Check Synchronism Fail
18
19
19.1
Remove Local Loopbacks
19.1.1
Restoring Direct Fibre Connections
19.1.2
P54x1i-TM-EN-1
Contents
669
669
669
669
669
670
670
670
670
670
671
671
672
672
672
673
673
673
674
674
674
674
674
675
675
675
675
676
676
676
677
677
677
678
678
678
679
679
679
680
680
681
681
681
682
682
682
682
683
683
684
684
684
685
686
686
686
687
xix

Advertisement

Table of Contents
loading

This manual is also suitable for:

Micom p543iMicom p545i

Table of Contents