GE MiCOM P40 Agile Technical Manual page 20

Single breaker current differential (with distance)
Hide thumbs Also See for MiCOM P40 Agile:
Table of Contents

Advertisement

Contents
5.1.4
External Wiring
5.1.5
Watchdog Contacts
5.1.6
Power Supply
5.2
Product Checks with the IED Energised
5.2.1
Watchdog Contacts
5.2.2
5.2.3
Date and Time
5.2.4
5.2.5
Test Alarm and Out-of-Service LEDs
5.2.6
Test Trip LED
5.2.7
Test User-programmable LEDs
5.2.8
Test Field Voltage Supply
5.2.9
Test Opto-inputs
5.2.10
5.2.11
Test Serial Communication Port RP1
5.2.12
5.2.13
5.3
Secondary Injection Tests
5.3.1
Test Current Inputs
5.3.2
6
6.1
6.2
Loopback Test
6.2.1
6.2.2
InterMicom Channel Diagnostics
6.2.3
Simulating a Channel Failure
7
7.1
Checking the Interface
7.2
Setting up the Loopback
7.3
Loopback Test
8
8.1
GPS Optical Signal Strength
8.2
Check Synchronisation signal at the IED
9
9.1
Apply Application-specific Settings
9.1.1
Transferring Settings from a Settings File
9.1.2
Entering settings using the HMI
10
IEC 61850 Edition 2 Testing
10.1
Using IEC 61850 Edition 2 Test Modes
10.1.1
IED Test Mode Behaviour
10.1.2
Sampled Value Test Mode Behaviour
10.2
10.3
Testing Examples
10.3.1
10.3.2
Test Procedure for Simulated Values - No Plant
10.3.3
10.3.4
11
Current Differential Protection
11.1
Current Differential Bias Characteristic
11.1.1
Lower Slope
11.1.2
11.2
Current Differential Operation and Contact Assignment
12
Distance Protection
12.1
Dependency Conditions
12.2
Distance Protection Single-ended Testing
12.2.1
Preliminaries
12.2.2
12.2.3
Zone 2 Reach Check
xviii
P543i/P545i
644
645
645
645
645
646
646
647
647
647
647
647
647
648
648
649
650
650
650
651
652
652
652
653
653
653
654
654
655
655
656
656
656
657
657
657
657
659
659
659
659
660
660
661
661
662
663
664
664
664
665
665
667
667
667
667
668
668
P54x1i-TM-EN-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Micom p543iMicom p545i

Table of Contents