Scl/Scm Power Wiring Diagram - Lenze SCL series Installation And Operaion Manual

Hide thumbs Also See for SCL series:
Table of Contents

Advertisement

9

SCL/SCM POWER WIRING DIAGRAM

Input
Single Phase Models
Input AC Voltage
L1
L2/N
B- B+
PE
0 25 5 HP
7 5 10 HP
(0 37 4 kW)
(5 5 7 5 kW)
4 5 lb in / 0 5 Nm
10 lb in / 1 2 Nm
0 24 in / 6 mm
0 35 in / 9 mm
Torque Requirements
WARNING!
DO NOT connect ncomng AC power to output termnals U, V, W, or termnals
B+, B-! Severe damage to the drve wll result .
Leakage current may exceed 3 .5 mA AC . Mnmum sze of the protectve earth
(PE) conductor shall comply wth local safety regulatons for hgh leakage current
equpment .
NOTE
WIRE AND GROUND IN ACCORDANCE WITH NEC OR CEC, AND ALL
APPLICABLE LOCAL CODES .
Motor wres MUST be run n a separate steel condut away from control wrng
and ncomng AC power wrng .
Do not nstall contactors between the drve and the motor wthout consultng AC
Technology for more nformaton . Falure to do so may result n drve damage .
Use only UL and CSA lsted and approved wre .
Mnmum wre voltage ratng s 300 V for 120, 208, and 240 Vac systems, and
600 V for 400 and 480 Vac systems .
Wre gauge must be based on a mnmum of 125% of the rated nput/output current
of the drve, and a mnmum 75°C nsulaton ratng . Use copper wre only .
SM01M
Input AC Voltage
15 HP
(11 kW)
18 lb in / 2 0 Nm
0 5 in / 13 mm
PES
PES
Input
Three Phase Models
208/240V up to 5Hp
400/480V up to 7.5Hp
PE lug on heatsink
L1
L2 L3 B- B+
Output
U
V
W
PE PE
3-Phase
AC Motor
14
Input
Three Phase Models
208/240V 7.5Hp and larger
400/480V 10Hp and larger
Input AC Voltage
PE lug on heatsink
L1
L2 L3
Output
T1 T2 T3 B- B+
PES
-
+
DC
3-Phase
AC Motor
Bus
Voltage

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scm series

Table of Contents