Connection Diagram - Lenze 482 Operating Instructions Manual

Speed controllers 480 series
Table of Contents

Advertisement

4.3

Connection diagram

L2
Connections made at the factory
L3
L1
PE
L1
L2
L3
A
B
L1.1
L
K
A
B
Mains
M
filter
F1 F2 F3
Mains
filter
PE L1 L2 L3
N
U = 340...460V 50...60Hz
3L
U
= 190...265V 50...60Hz
L1, N
Explanations

Only the feedback system used can be connected at terminals 1/2 or 3/4.
Note
1. If the signals must be changed over via relays, use suitable
relay contacts (e.g. gold-plated contacts).
2. When switch RFR is closed the controller is enabled.
L
L2(N)
I
K
L1.1
L2.2
L3.2
I
K
PE
Feedback
Set-value
1
input
+V
-V
CC
CC
1
2
3
4
7
8
9 12 14 16 17 31
n
min
RFR
R
n
set
n
max
+
G
-
Tacho
+
PE
U
=10...180 V
G
TN
-
Master voltage
= 10...180 V
U
LN
33
38 40
PE
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

481485484483

Table of Contents