IBM 7015-R50 Installation And Service Manual page 63

Cpu enclosure
Hide thumbs Also See for 7015-R50:
Table of Contents

Advertisement

0
1
2
3
4
x
Build Test List
This command is used to build a test list, which is a sequence of tests to be run. To build a
test list, perform the following steps:
1. Enter 0 from the OFF-LINE TESTS menu to display the following menu.
GROUP
01
04
06
20
COMMANDS: nn> SELECT GROUP
SELECT [x:exit]:
Note: For a description of the test groups, see page A-3.
2. Select a test group of your choice by entering the group ID. For example, to select the
interrupt test group, enter 06.
Note: Use the slash ( / ) character to separate different test groups. For example, enter
01/03/11 specify the BUMP Quick IO, Direct IO, and MCA test groups with default
parameter values.
Displays the build test menu, which enables you to specify the test list (see
"Build Test List" below).
Displays and enables modification of the tests in the build list (see page
2-31).
Deletes the tests in the build list, after operator confirmation. Attempting to
delete tests from an empty list causes an error message to be displayed.
Runs selected tests (see page 2-32).
Displays an error report.
Exits this menu and returns to the MAINTENANCE MENU.
BUILD TEST LIST
DESCRIPTION
BUMP QUICK IO
CPU
INTERRUPT
MULTIPROCESSOR
* > ADD ALL AVAILABLE TEST TO TEST LIST
GROUP
DESCRIPTION
03
DIRECT IO
05
DCB AND MEMORY
11
MCA
Using SystemGuard
2-29

Advertisement

Table of Contents
loading

This manual is also suitable for:

7015-r407015-r30

Table of Contents