IBM 7015-R50 Installation And Service Manual page 224

Cpu enclosure
Hide thumbs Also See for 7015-R50:
Table of Contents

Advertisement

GROUP NO
05
06
11
20
Notes:
(*) For Manufacturing people only.
(**) For Field people only.
Some tests in this list are run only if an error is detected by the regular power-on self-tests
(POST). They are run as extended POST tests and include:
1. Multi-Resources Full Tests.
2. Main Memory Full Tests.
Some tests are only available through the Off Line Test Monitor under the maintenance
menu. They are not available and not run during Power On. They are as follows:
1. Asynch. lines L–B Test
2. BPP Ext. L–B Test
3. Printer Test
4. Dial-Out Test
5. Floppy Disk Ext. Test
6. MM Full Test
7. SCSI–D ext. Test.
A-2
Operator Guide
GROUP
TEST NO
DCB and Memory
test group
Interrupt test group
Disk Accessibility
group
Multi–processor
test group
TEST
01
MM Data lines Test
02
MM Address lines Test
03
MM board dec. Test
04
MM Basic acc. Test
05
MM components Test
06
ECC component Test
07
ECC mechanism Test
08
Refresh mech. Test
09
ECC Data lines access. Test
50
MM Full Test (K/H)
01
BUMP to CPU interrupt Test
02
CPU to BUMP interrupt Test
03
UART to CPU interrupt Test
04
CPU to CPU interrupt Test
05
TOD to BUMP interrupt Test
06
MCA to CPU interrupt Test
01
LSA/WSA SCSI basic Test*
02
LSA LAN basic Test*
50
Disk accessibility
51
LAN external*
52
Mouse Keyboard
*Test not available on all systems
01
Atomic instructions Test
02
Caches coherencies Test
03
DCB ports arbitration Test
04
TLB Mechanism Test
05
System IO share Test
06
Main memory share Test
07
Multi–resources sharing Test
08
Multi–processor full Test

Advertisement

Table of Contents
loading

This manual is also suitable for:

7015-r407015-r30

Table of Contents